SOC 2 requires a risk assessment under CC3, but not a risk management programme. At startup size the artefact is one table: fifteen to thirty risks, each with a likelihood, an impact, the controls that address it, what you decided to do about it, and an owner — approved by management and dated, at least once a year, and again when something material changes. An afternoon of honest thinking produces it. What auditors reject is not a simple table; it is a table with no link to your controls, no mention of fraud, or the same contents as last year.
What CC3 actually asks for
CC3 is the risk assessment series in the Trust Services Criteria, and it has four criteria. Translated out of AICPA prose, they ask whether you:
- CC3.1 — stated your objectives clearly enough to tell what threatens them. For most startups this is one sentence: keep customer data confidential, keep it intact, and keep the service available.
- CC3.2 — identified the risks to those objectives and analysed them well enough to decide what to do about each.
- CC3.3 — considered the potential for fraud. This is the one almost every first draft leaves out.
- CC3.4 — identified changes that could significantly affect your controls: a new product, new infrastructure, a new critical vendor, a key person leaving.
Notice what is missing. Nothing requires a named methodology, a risk management platform, quantitative loss modelling or a risk committee. NIST SP 800-30 and ISO 27005 are useful references, but the criteria require neither. The requirement is that you did the thinking, wrote it down, acted on it, and can show when.
The risk assessment is also what justifies everything else. CC5 asks that your controls be selected to mitigate the risks you identified, so an auditor reads the two together. A control with no risk behind it looks like a template; a serious risk with no control against it, and no decision to accept it, looks like a gap.
The table that satisfies it
One row per risk. These columns are enough, and each one earns its place:
| Column | What goes in it |
|---|---|
| ID | R-01, R-02… so controls and tickets can refer to it |
| Risk | What could happen, to what, and why: “an engineer's laptop is stolen and exposes source code and cached credentials” |
| Likelihood and impact | Low, medium or high for each, before counting your controls |
| Existing controls | What already reduces it: disk encryption enforced by device management, SSO session revocation |
| Treatment | Mitigate, accept, transfer or avoid — one word, deliberately chosen |
| Action and owner | What happens next, who does it, by when. Blank only if the treatment is accept |
| Residual rating | Where the risk lands once the controls are counted |
Here are four rows the way they might read at a twelve-person SaaS company:
| Risk | L / I | Treatment |
|---|---|---|
| R-01 A former employee or contractor keeps access to production or the code repository | Medium / High | Mitigate: offboarding checklist and quarterly access review. Owner: CTO |
| R-04 A cloud access key is committed to a public repository | Medium / High | Mitigate: secret scanning on every push, no long-lived keys for people. Owner: engineering lead |
| R-09 A staff member is tricked into paying a fake supplier invoice | Medium / Medium | Mitigate: changes to payment details confirmed by phone to a known number. Owner: CEO |
| R-12 The primary cloud region suffers an extended outage | Low / High | Accept: multi-region is not justified at current scale; revisit at the next review. Owner: CEO |
Above the table, write four lines: the date, who took part, the scope (the system in your report, not the whole company), and who approved it. Those four lines are what turn a spreadsheet into evidence.
Identifying risks without a framework
The blank page is the hard part. Rather than starting from a catalogue of three hundred generic threats, walk through your own company in five passes and ask what would hurt at each stop:
- People. Joiners and leavers, phishing, the one person who holds knowledge or credentials nobody else has, misuse by an insider.
- Access. Admin rights, shared accounts, service credentials, the cloud root account.
- Infrastructure and code. A bad deployment, an unpatched dependency, a misconfigured storage bucket, losing the database with no restore that has ever been tested.
- Vendors. Each critical vendor failing, being breached or changing its terms. Your cloud provider and identity provider belong here by name.
- Money and fraud. Invoice fraud, a compromised finance account, someone altering usage or billing data, one person able to both create and approve a payment.
Then two shortcut passes catch what the walk missed. Read the last six months of incidents, near misses and customer security questions — each one is a risk somebody already worried about. And read your own policies: every policy exists because of a risk, and if that risk is not in the table, either the table or the policy is wrong.
Fifteen to thirty risks is a sensible range at this size. Fewer than ten usually means the exercise was rushed; more than fifty usually means it was copied.
Scoring without pretending to precision
Use three levels for likelihood and three for impact. A five-by-five matrix with numeric scores implies a precision nobody at a small company has — the difference between a likelihood of 3 and a 4 is a guess, and auditors know it. All the scale has to do is separate the risks you act on now from the ones you can live with.
Define the levels once, in a line each, so that two people scoring the same risk land in the same place:
- Likelihood. High: expected within a year, or it has happened before. Medium: plausible within a year. Low: possible, but not expected.
- Impact. High: customer data exposed, or the service down for more than a day. Medium: internal data exposed, or a few hours of disruption. Low: an inconvenience customers never notice.
Score twice. The inherent rating is the risk with no controls; the residual rating is the risk with the controls you actually have. The gap between them is how you show your controls are doing something. If a risk scores the same before and after, either the controls are not relevant to it or the scoring was not thought through.
Disagreement is useful. If the CTO thinks a risk is high and the CEO thinks it is low, that conversation is the most valuable ten minutes of the exercise. Write down where it landed and why.
What to do with the output
Every row ends in one of four decisions, and the treatment column is the one an auditor reads most closely.
- Mitigate — add or strengthen a control. Give it an owner and a date, and track it wherever the rest of your work is tracked, so that finishing it leaves a record.
- Accept — a legitimate answer, not an admission. Accepting the risk of a regional outage at twelve people is a reasonable business decision. Record who accepted it and why, and look at it again next year.
- Transfer — usually insurance, or a contract that moves an obligation to a vendor. Transfer moves the financial consequence, not the risk itself, so most transferred risks keep a control as well.
- Avoid — stop doing the risky thing. Stop copying production data to laptops; retire the integration nobody uses.
Then close the loop. Each high residual risk should map to a named control in your policies or control list, and each mitigation action should be finished, or visibly in progress, by the next review. A risk assessment whose actions never happened is evidence that the process does not work.
How often to redo it
At least annually is what nearly every startup commits to and what auditors expect to see. The criteria do not fix a frequency, but your policy will, and the report tests the frequency you wrote down.
CC3.4 adds a second trigger: significant change. A new product line, a move to a different cloud provider, the first enterprise customer with genuinely sensitive data, or the departure of the one person who ran infrastructure should each prompt a short update. That does not mean rerunning the whole exercise — add or rescore the affected rows, and date the revision.
For a first Type 2 report, run the assessment early in the observation window rather than the week before fieldwork. A risk assessment dated after the controls it supposedly informed is backwards, and an attentive auditor will notice.
What auditors reject
- No fraud risks. CC3.3 asks for them explicitly. Two or three honest rows on payment fraud, data manipulation and misuse of admin access are enough.
- A downloaded template, barely edited. Generic rows about data centres you do not run, and no mention of the systems you actually use.
- No link to controls. Risks rated high, nothing in the controls column, and no acceptance recorded.
- No approval and no date. The single most common evidence defect, here as everywhere.
- The same document as last year. If nothing was added, rescored or closed in twelve months at a growing company, the review did not really happen.
- Owned by the consultant. Outside help can facilitate, but the judgements have to be management's, and so does the approval.
None of these is about sophistication. A plain table that is specific, dated, approved and connected to your controls passes; a polished one that is generic does not.
Questions people ask
Does SOC 2 require a risk assessment?
Yes. CC3 of the Trust Services Criteria requires you to identify and analyse risks to your objectives, consider the potential for fraud, and assess significant changes, and it applies to every SOC 2 report because it sits within the Security criteria. It does not require any particular methodology or tool. A documented, approved and dated assessment that links each risk to the controls addressing it satisfies it.
How often must a SOC 2 risk assessment be done?
At least annually is the standard commitment and what auditors expect, plus an update whenever something significant changes, such as a new product, a new infrastructure provider or a new critical vendor. The criteria do not mandate a frequency, but the report tests the frequency stated in your own policy, so commit to one you will keep.
Who should perform it?
Management, meaning the founders or leadership team, with input from whoever runs engineering and operations. A consultant or a compliance platform can facilitate and supply prompts, but the judgements and the approval need to belong to management, because the auditor is assessing whether management understands its own risks.
What format does an auditor expect?
No particular format. A spreadsheet or document table listing each risk with a likelihood and impact rating, the existing controls, the treatment decision, an owner and a residual rating is normal at startup size. Add the date, the participants, the scope and the approver at the top. A simple three-level scale is fine; precision is not what is being tested.
Do we need a risk register as well?
At startup size they are usually the same document. The risk assessment is the exercise; the risk register is the table it produces and keeps current between assessments. Keep one table, version it each time it is reviewed, and keep the old versions, because the history is part of the evidence that the process actually runs.